Bills of materials and engineering changes
Keep product structures accurate over time and change them under control.
- Multi-level BOMs with phantom sub-assemblies, scrap percentage and alternates
- Co-products and by-products with a cost share
- BOM versions with effective dates, one active per date
- Engineering change orders approved before the new revision takes effect
- Drawings and documents attached to BOMs and routings